Frame building time seem to short for the main frame (rework, drilling and assembly), arms (not cut nor drilled) and axle (widths cut and drilling and assembly) builing. Even more if it includes a bit of documentation. Il will probably drift on friday and even saturday, but fortunately the "bike parts" will concern only one vehicule and hence most of the people will be able to finish their frame building.
Apart from this I love the timetable look 😍